top of page

PROJECT

LT SERVICING MAINTENANCE OF LOW VOLTAGE SWITCHBOARD

  • British High Commission Singapore

  • JEM Shopping Center 

  • Sports Hub

  • Seagate Singapore Design Centre

  • WPP

  • Park Ave Hotel

  • Warehouse Logistics Net Asia

  • CR-71

  • RE&S

  • Kuehne + Nagel

ELECTRICAL REPAIR AND REPLACE WORKS

  • Installation 60KVA UPS and UPS Switchboard at Jurong port

  • Replace Harmonic Filters at MBFC

  • Supply and installation 2 set 150KVA Diesel Generator and Switchboard at changi airfreight centre

  • Supply and Replace 250KW Schneider VSD at 81 Tuas view walk 1

  • Modification of MCC Panel and supply and install protection relay at 7 Tuas ave 10

  • Replace 1000A BUSBAR at Oasia Hotel

  • Replace 33 Nos Harmonic Filters at RWS

  • Provide temporary cable and switchboard at UE2

  • Replace 400A ATS at Strand Hotel

  • Repair ATS control at ARK @ Gambas 7 Gambas crescent

  • Replace 600A ATS and control at PSA Pasir panjang terminal building 1

  • Troubleshooting ATS Control at Concorde hotel at 100 Orchard road

  • Repair of 150A Busbar tap off unit at 1 Raffles Place tower 1 

3W ENERGY PTE LTD

P: +65 6904 4525

F: +65 6904 4526

3025 Ubi Road 3, #02-141  Kampong Ubi Industrial Estate 
Singapore 408653

bottom of page