PROJECT
LT SERVICING MAINTENANCE OF LOW VOLTAGE SWITCHBOARD
-
British High Commission Singapore
-
JEM Shopping Center
-
Sports Hub
-
Seagate Singapore Design Centre
-
WPP
-
Park Ave Hotel
-
Warehouse Logistics Net Asia
-
CR-71
-
RE&S
-
Kuehne + Nagel
ELECTRICAL REPAIR AND REPLACE WORKS
-
Installation 60KVA UPS and UPS Switchboard at Jurong port
-
Replace Harmonic Filters at MBFC
-
Supply and installation 2 set 150KVA Diesel Generator and Switchboard at changi airfreight centre
-
Supply and Replace 250KW Schneider VSD at 81 Tuas view walk 1
-
Modification of MCC Panel and supply and install protection relay at 7 Tuas ave 10
-
Replace 1000A BUSBAR at Oasia Hotel
-
Replace 33 Nos Harmonic Filters at RWS
-
Provide temporary cable and switchboard at UE2
-
Replace 400A ATS at Strand Hotel
-
Repair ATS control at ARK @ Gambas 7 Gambas crescent
-
Replace 600A ATS and control at PSA Pasir panjang terminal building 1
-
Troubleshooting ATS Control at Concorde hotel at 100 Orchard road
-
Repair of 150A Busbar tap off unit at 1 Raffles Place tower 1